Mongla
Port
Mongla
Port is situated on the East
Bank of Pussur River near the
confluence of Pussur River and
Mongla Nulla at Channel
distance of 71 Nautical Miles
from the Fairway Buoy situated
(Lat. 21026.9` N.
long. 890 34.4
E) in the Bay of Bengal.
Mongla
Port
is
basically a service as well as
income oriented organization.
The port provides facilities
and services to the
international shipping lines
and other concerned agencies
providing shore based
facilities like jetties,
godowns, cargo handling
equipment and maintaining
adeuate water depth in the
channel as well as making
provision for safe day and
night shipping.
Facilities
:
The
port is under the
administrative control of the
Ministry of Shipping. Mongla
Port Authority is managed by a
board which consists of
Chairman and three other Berthing
facilities: 2 ships at
the jetty, 5 ships at mooring
buoy and 7 ships at anchorage
and including private jetties
total 14 ships can take berth
at a time. Besides there is
wide scope of berthing of more
ships in the anchorage.
Facilities
in the Channel: Channel
draft is 6.0 to 8.5 meter. For
safe guidance of ship in the
channel there are 21 lighted
buoys (inner channel-3 buoys,
outer anchorage- 16 buoys and
fairway buoy-1) and 1 Beacon
(at Hironpont). Max. length of
200 meter ships can cross the
Pussur channel.
Jetty/Warehouse/Yard
facilities: 5
jetties (length 182.92 meter
each), 4 transit sheds (4907
Sqm. each & total capacity
in average 17932 M.ton),
2 warehouses (9815 Sqm.) each
& total capacity in
avr.15326 M.ton),120 refer
plug points and 3 container
yards (35752 TEUS at one
stack).
Electricity
Facilities: For
constant supply of electricity
there are 6 sub-stations and 5
power generating stations.
Moreover, special facilities
are provided for refer
container from own generator
of MPA.
Vessels
& Crafts: 3
Tug boats, 01 Fire
fighting tug, 2 Pilot launch,
4 dispatch launch, 3 Survey
launch, 4 Mooring boats, 1
Buoy Tender Vessel, 3 Self
propelled water crafts, 2
Inspection launch, 1 Oil
storage vessel, 2 ferry
launch- total 26 vessels and
crafts are ready for smooth
functioning of Port.
Major
Import & Export
The
port is under the
administrative control of the
Ministry of Shipping. Mongla
Port Authority is managed by a
board which consists of
Chairman;
Port
Handle :
Imports:
Food grain, Bulk cement,
Clinker, Fertilizer,
Machinery, Motor Vehicle,
General cargo etc.
Exports:
Jute, Jute goods, Goods,
Shrimp, Frozen food, General
cargo etc.,
Development
Project:
Present
government has given top
priority for developing port
facilities up to international
standard. To develop the port
7 development projects have
been undertaken at an
estimated cost of Tk. 467.45
crore. A sum of Tk. 59.00
crore has been allocated in
the ADP of 2010-2011. It is
expected that after
implementation of those
projects port will be operated
efficiently. Project wise
description are as follows:
Procurement
of Cargo Handling Equipment:
For
procuring cargo and container
handling equipment the project
has been undertaken at a cost
of Tk. 22.97 crore. The
project was approved on
04.11.2007. Under the project
2 Nos. Straddle Carrier, 2
Nos. Terminal Tractor and 2
nos. Container trailer has
been procured and to procure 6
nos. Forklift truck L.C
has been opened on 19.09.2010.
Forklift trucks are expected
to arrived at
Mongla
Port
soon.
Navigational
Aids to
Mongla
Port
:
To
assist movement of sea-going
vessels in the channel day and
night the project has
been undertaken at a cost of
Tk. 23.00 crore. The
project was approved on
13.05.2008. Under this project
62 nos. buoys, 2nos. beacons,
6nos. light towers with
lanterns and anchors will be
procured and installed. To
procure proposed navigational
aids 3rd time tender was
called on 09/03/2010 and
opened on 01/04/2010.
Activities of tender was
suspended by the Ministry of
Shipping. Recently Ministry of
Shipping has withdrawn
the suspension. New Project
Director has been appointed
and further activities of the
project has been started. The
project is scheduled to be
completed by June 2011.
Dredging
at the Outer Bar in the Pussur
Channel:
The
project has been undertaken to
increase navigability at the
Outer bar area of the Pussur
Channel to facilitate entrance
of more than 9 meter draft
ships into
Mongla
Port
area easily. The project at an
estimated cost of Tk. 58.46
crore was prepared to dredge
about 3.2 million cubic metre
silt in the Outer Bar area.
The project was approved by
ECNEC on 27.09.2006. Under the
project five times tender was
floated, due to non receipt of
any tender it was called for
sixth time and only one tender
was received, but the quoted
price was about 91% above than
the approved cost of the
project. As per decision of
ECNEC meeting RDPP of the
project was prepared and
sent to the Planning
Commission through Ministry of
Shipping for approval. The
project is under process of
approval.
Dredging
in the Harbour Channel of
Mongla
Port
:
To
increase the navigability of
the Harbour Channel of the
Pussur
River
the project has been
undertaken. The project has
been approved on 30.03.2010 at
a cost of Tk. 100.00 crore.
Under the project 4.196
million cum dredging will be
done at different places in
the Pussur Channel. After
completion of
Pre-qualification, tender for
dredging works has been called
on 18-10-2010 and will be
opened on 15-12-2010.
Implementation period of the
project is 2010- 2011 to
2012-2013.
|