Welcome to vyapaarasia.com   

My ATH | Sign Up Now

 

Home Asian Contents TradeHub Gallery BuySell Leads

Products Hub

Bangladesh Infrastructue > Ports

Contents

Contents

General Detail

General Information

Infrastructure

Vision 2021

Introduction

Surface Transport

Industry

Roads

Ports

Telecom

Power

Oil & Gas

Budget

Budget 2011-12

Banking

Banking

Travel

Travel

Policies

Export Policy

Import Policy

Trade Policy

Foreign Policy

Economic Policy

Trade

Trade

Foreign Direct Investment

Tax Structure

Tax System

Important Contacts

Important Contacts

 Previous Page

1 2 3 4

Next Page

Major Imports & Export:  

Import: Food grain, Cement clinker, Sugar, Salt, Fertilizer, General cargo, Iron Materials, Chemicals, Coal and Edible oil etc.  

Export: Ready Made Garments, Knitwear, Fertilizer, Jute & Jute Products, Hides and Skins, Tea, Naphtha, Molasses, Frozen foods etc.

 

Recently Completed Projects:  

Construction of a Container Terminal at New-Mooring area of Chittagong Port. (Completed in 2008);  

IDA funded Feasibility study for construction of one new ICD near Dhirasram Railway Station in Gazipur District (Completed in 2007);   

ADB funded Port Efficiency Improvement Project (PEIP). (Completed in September 2008).  

Techno-Economic Feasibility Study for Deep Sea Port in Bangladesh (Completed in June 2009).

 

Ongoing Projects:  

ADB Funded Chittagong Port Trade Facilitation Project (CPA Component) (Estimated Cost : Tk. 13000.00 Lakh);  

Construction of Backup facilities behind berth no. 4 & 5 of New-Mooring Container Terminal (NCT) (Estimated Cost : Tk 11448.00 Lakh);  

Capital dredging and Bank Protection Work with jetty facilities in Karnaphuli River from 3rd Karnaphuli Bridge to Sadarghat jetty (Estimated Cost: 37634.22);  

Appointment of Private Global Terminal operator for operation & management of New-Mooring Container Terminal (NCT) on SOT basis;  

Construction of one ICT at Pangaon (Estimated Cost: Tk 17757.00 Lakh);  

Introduction of Personnel Management Information System (PMIS);  

Installation of VTMIS. (Estimated Cost: 4500.00 Lakh);  

Shifting and Reconstruction of Service Jetty located near Dock office to upstream of Jetty No, 1 within Chittagong Port restricted area (Estimated Cost: 6300.00 lakh);  

Construction of one Multistoried vehicle parking shed for 5,500 units (Estimated Cost: 5000.00 lakh);  

Replacement of River Mooring no. 3 and 4 by Dolphin Jetty (Estimated Cost: 6000.00 lakh).

 

Future Projects:

 

Short Term:  

Construction of Karnaphuli Container Terminal (KCT) at existing Jetty-11, 12 & 13 of Chittagong Port ;  

Preparation of a comprehensive Master Plan for Development of the Chittagong Port ;

Procurement of vessels & crafts;  

Construction of one Truck Terminal within the vicinity of port area;  

Renovate X-Y shed area for FCL/LCL container stripping and build a large CFS.  

Construction of a Modern Hospital .

 

Mid Term:  

Construction of a Multi-storied Vehicle Parking Shed.  

Construction of Multipurpose berth with necessary back up facilities at existing jetty no. 7-10.  

Creation of berthing facilities for inland vessels at the upstream of river Karnaphuli;  

Procurement of one high powered Tug (4000 BHP);  

Procurement of one Patrol Boat;

 

Long Term:  

Construction of Patenga Container Terminal (PCT) outside the port protected area of Chittagong Port ;  

Construction of a modern Container Terminal upstream of Khal no. 7;  

Construction of one Truck Terminal near Chittagong Port Access Road (CPAR);  

Construction a connecting road between CEPZ square and Baro Pole;  

Develop specialized sheds and CFS for GCB in the Marine Workshop area;