Welcome to asiatradehub.com   

My ATH | Sign Up Now

 

Home Asian Contents TradeHub Gallery BuySell Leads

Products Hub

Bhutan > Infrastructure

Contents

Contents

General Detail

General Information

Infrastructure

Civil Aviation

Surface Transport

Industry

Roads

Mines

Telecom & Media

Urban Development

Power

Oil & Gas

Banking

Banking

Travel

Travel

Policies

Exim Policy

Trade

Trade

Revenue Performance

Traders Manual

Tax Structure

Tax System

Important Contacts

Important Contacts

 Previous Page

1 2 3 4 5 6

Next Page

TRAINING

The objective of training is to provide good understanding of all the facets of operations at the Retail Outlet. Training shall ensure that the jobs are performed in accordance with the laid down procedures and practices.

  • Each POL dealer in collaboration with their principle oil company shall develop training module of their own which should include, inter-alia, the following :

    a) Hazardous characteristics of product handled.
    b) Familiarisation with operational procedures & practices.
    c) Hands on experience on operation of equipment.
    d) Knowledge of emergency and manual shut down systems.
    e) Immediate and effective isolation of any spill
    f) Safety features and accident prevention.
    g) Fire fighting facilities, its upkeep and operation.
    h) Evacuation and safe egress of the vehicles in an emergency.
    i) Housekeeping
    j) Decantation.
    k) Dos & Don’ts
    l) Emergency plan./drills,

Additionally, people shall be trained for specific job / activity.

CUSTOMER SAFETY & AWARENESS

  • Display of important information:
    a. At Retail Outlet, the particulars of licence, emergency telephone numbers of local fire service, police, marketing company and emergency instructions shall be conspicuously displayed. 

  • Caution boards shall be displayed near the dispenser for customer awareness as below:
    a. Stop the engine before refueling
    b. No smoking
    c. Non-use of Mobile phone

DOs & DON’Ts

DOs

  1. Switch off the mobile phone.

  2. Switch off the engine before commencement of refueling.

  3. Ensure a 10 kg DCP Fire Extinguisher is available near the Dispenser.

  4. In case of any spill / fire observed, press the “EMERGENCY STOP” button on the Dispenser.

DON’Ts
Do not start the engine / drive away the vehicle till the filling nozzle has been disconnected from the filler cap of the vehicle.

  1. Do not refuel the vehicle during the period MS/HSD is being decanted to the tank.

  2. Do not Smoke

  3. Do not use naked flame

Daily Check List

    Date:                                                                       Time:

Sr.No

Particulars

Remarks

(To be carried out by individual DSM on rotational basis)

1.

All the Dispensing Units externally & internally clean. In the sand below Dispensing units there is no Spillage of product and inflammable waste.

Y/N

2.

All the piping connections of Dispensing units & tank farm are leak free & there is no sweating in the joints

Y/N

3

Wire mesh in the product vent is not choked with foreign matter.

Y/N

4.

Fire Extinguishers are in place and are valid for use as on date.

Y/N

5.

Road & pathways are clear of any obstructions.

Y/N

6

Safety signs are in place. (No smoking, Mobile Phone Switch Off)

Y/N

7

Tank farm is clean and free of dry vegetation.

Y/N

8

The sand in the fire bucket is dry and without any lumps.

Y/N

9

All the light fixtures at the periphery, canopy and the sales room are in working condition.

Y/N

10

No employee of the Retail Outlet is in an intoxicated state

Y/N

11

Daily briefing [Dos and Don’ts] on Safety before starting of shift has been carried out

Y/N

12

There are no electrical faults observed in the entire Retail Outlet.

Y/N

 

 Previous Page

1 2 3 4 5 6

Next Page

 

  2000- Matrix net-on-line Limited , All Rights Reserved /Disclaimer

ADVERTISE HERE